QUALITY CONTROL
The quality leader in independent market sourcing
The quality leader in independent market sourcing
Incoming Inspection Escalation Process
- Level 1 (Green)
Incoming Inspection & Authenticity Verification by Inspector.
- Level 2 (Orange)
Verification by Quality Engineer
- Level 3 (Red)
External Testing by Certified Test Lab or Test House
QUALITY PROCESS
1st Level - Incoming Visual Inspection
- 01
Package inspection
Check package condition for any sign of damage
- 02
DOcuments Verification
Verify documents from the Vendor
- 03
Digital Photography
Take photos of the package received ( Label and Packaging)
- 04
Requirement Verification
Verify the received parts Vs Purchase order
- 05
Record and Receive
Record all the information and Photos on System and Internal Database
- 06
Storage Rack
Parts will be put on Locator Rack for the Next Process step
QUALITY PROCESS
2nd Level - Quality Visual Inspection
- 01
PO / SO Requirement Verification
Verify information from Receiving Vs PO and SO requirements
- 02
Parts Label Verification
Parts Labels will be verified and compared to our internal database
- 03
Perform Sampling Visual Inspection
Perform Sampling Inspection ( Marking, Leads, Solder ball, and ) Surface
- 04
Dimension Checking
Parts dimensions will be measured according to the datasheet
- 05
Digital Photography
Photos will be taken during each procedure
- 06
Surface & Scrape Test
Surface and Scrape Test will be performed
QUALITY PROCESS
3rd Level - Quality Visual Inspection
- 01
Solderability Test
Parts with over 2years Date code
- 02
Radiographic Inspection(X-ray)
Verify Internal Component construction (Non-destructive)
- 03
Lead Finish Evaluation-XRF (RoHS)
Verify lead/pins RoHS Compliance
- 04
Decapsulation
Verify Die Topography and Authenticity
- 05
QC Approval
QC Approval to release the parts
- 06
Record and Store on Database
Information and Photos will be saved on our internal database